Demolition with on-site material reuse
Article

Demolition with on-site material reuse

Screening on site removed most of the cart-away cost.

Demolition with on-site material reuse

A factory demolition in Germiston generated a large volume of broken concrete and mixed rubble. Carting all of it away and importing fill would have consumed a significant part of the project budget.

We supplied a 22 ton excavator with a pulveriser and sorting grapple, plus a screening bucket to separate usable fines from oversize on site.

Roughly two thirds of the demolition material was reused as fill on the same site. Cart-away trips dropped sharply and the imported fill order was cancelled entirely.

From the field

Demolition with on-site material reuse
Demolition with on-site material reuse
Crew on site
Crew on site
Fleet supplied
Fleet supplied
Site overview
Site overview

Planning a project like this?

Our team can spec the right fleet mix for your programme and site conditions.