A 40 000 m³ platform in Midrand
Article

A 40 000 m³ platform in Midrand

Bulk earthworks, layer works and testing in one contract.

A 40 000 m³ platform in Midrand

A warehouse development in Midrand required bulk cut and fill across a sloping site, followed by layer works to a specified density before slab construction could start.

We supplied a 36 ton mass-excavation excavator, three 30 ton articulated haulers, a 14 ft motor grader and a padfoot soil compactor as a single package, with a water tanker to hold moisture at optimum through a dry August.

Every layer passed density testing first time. The contractor moved onto slab work a week early, which pulled the whole project programme forward.

From the field

A 40 000 m³ platform in Midrand
A 40 000 m³ platform in Midrand
Crew on site
Crew on site
Fleet supplied
Fleet supplied
Site overview
Site overview

Planning a project like this?

Our team can spec the right fleet mix for your programme and site conditions.